Capability ledger

Every project must leave the institution more capable than it found it. The ledger records what was built and what that artifact has actually been shown to do — four states, each confirmed by someone other than its author.

01

Four states

  1. Project → New capability.
  2. Project → New infrastructure.
  3. Project → New knowledge.
  4. Project → New method.
  5. Project → Reusable component.
  6. New capability → Capability Ledger.
  7. New infrastructure → Capability Ledger.
  8. New knowledge → Capability Ledger.
  9. New method → Capability Ledger.
  10. Reusable component → Capability Ledger.
  11. Capability Ledger → Next project starts higher.
Fig.

Every project should leave a capability, infrastructure, knowledge, a method or a reusable component in the ledger, so the next project starts higher.

Figure provenance

Drawn from the canonical Mermaid source in RESEARCH.md §Capability accumulation. All 8 nodes and 11 relationships below are checked against the drawing at every build.

flowchart TD
    P[Project] --> C1[New capability]
    P --> C2[New infrastructure]
    P --> C3[New knowledge]
    P --> C4[New method]
    P --> C5[Reusable component]
    C1 --> L[Capability Ledger]
    C2 --> L
    C3 --> L
    C4 --> L
    C5 --> L
    L --> N[Next project starts higher]
  1. 01 · 1 recordedArtifact created

    A documented, locatable artifact exists.

    Confirmed by: Independent team member
  2. 02 · 0 recordedArtifact reused

    A second project consumed it without rebuilding it.

    Confirmed by: Consuming project lead
  3. 03 · 0 recordedCapability demonstrated

    Its use produced a measured advantage over the counterfactual.

    Confirmed by: Adversarial reviewer (vacant)
  4. 04 · 0 recordedCapability compounded

    The advantage raised the starting floor for a chain of ≥ 3 projects.

    Confirmed by: Independent reviewer
#001

Loams

Artifact created

An open-source, AI-native data platform where object storage is the durable foundation for hybrid retrieval (vector + BM25 + graph), with reactive application state and durable agent execution.

Status

CI-1, PM-1 (50 ms), L1-V1 (pinned commit c2f7ea4), and L1-SLO (1,500 ms) thresholds committed. Advancement past "Artifact reused" blocked while Adversarial Ledger Reviewer role is vacant (STATUS: BOOTSTRAP).

Provisional until: Conformance suite passes with pinned commit c2f7ea4 and independent benchmark confirms consistency-token latency ≤ 50 ms p99.

Conditions

Correctness
CI-1: Read-your-own-writes (RYW) guaranteed for any client carrying its write consistency token under all single-node and cluster partition failure modes up to quorum failure.
Performance
PM-1: The consistency token model cannot achieve read-your-own-writes within 50 ms p99 of the write returning for standard reference workload without full Lance/Tantivy materialization. Threshold: 50 ms p99.
Exit
L1-V1: Applications using Loams fail the conformance suite pinned to commit c2f7ea4dabba0ddd35512cec239cb51f1eaa5326, OR exporting collection data followed by native serving requires rewriting >10% of code.
Cold start
L1-SLO: First query against a cold namespace (>30 days inactive) exceeds 1,500 ms p99.
Success
Formal verification of RYW correctness plus independent benchmark confirming ≤ 50 ms p99. Conformance suite passes with independent verification and ≥ 3 documented zero-rewrite migrations.

Recorded artifacts

  • CI conformance test suite pinned to commit c2f7ea4
  • Local multi-node cluster integration tests
  • Read-Your-Own-Writes latency harness
Repository ↗ Instrument record